Short Term
Wednesday (9/1) 6 p.m. until Friday (10/1) 6 p.m., Eastbound 7th St. will be closed at US 183. Detour to Airport Blvd.
Bridge Construction
Road Closure
CONTINUOUS CLOSURE: Wednesday (9/1) 6 p.m. until Friday (10/1) 6 p.m., Eastbound 7th St. will be closed at US 183. Detour to Airport Blvd. southbound entry ramp via Levander Loop.
Bridge Construction
Lane Closure
Sunday-Saturday (9/19-9/25) 8 p.m. to 6 a.m., Mobile Ops: US 183 general-purpose in both directions one lane will be closed from US 290 to SH 71.
Roadway Striping
Lane Closure
Sunday-Wednesday (9/19-9/22) 8 p.m. to 6 a.m., Mobile Ops: US 183 in both directions one main lane will be closed from US 290 to SH 71.
Roadway Striping
Ramp Closure
Monday-Friday (9/20-9/24) 9 a.m. to 3 p.m., US 183 northbound exit ramp to Montopolis Dr. the left lane will be closed at Thompson Ln.
Guardrail Work
Lane Closure
Monday-Friday (9/20-9/24) 9 a.m. to 3 p.m., US 183 general-purpose right lane in both directions will be closed from Interchange to Techni Center Dr.
Guardrail Work
Lane Closure
Monday-Wednesday (9/20-9/22) 9 a.m. to 3 p.m., US 183 in both directions the left main lane will be closed from Loyola to Manor Springdale
Guardrail Work
Lane Closure
Monday-Wednesday (9/20-9/22) 9 a.m. to 3 p.m., US 183 in both directions the left main lane will be closed from Loyola to Manor Springdale
Guardrail Work
Lane Closure
Monday-Friday (9/20-9/24) 9 a.m. to 3 p.m., US 183 general-purpose right lane in both directions will be closed from Patton to Montopolis
Guardrail Work
Ramp Closure
Tuesday (9/21) 8 p.m. to 6 a.m., Westbound SH71 Exit Ramp will be closed at E. Riverside Dr. Detour Montopolis Dr. U-turn
Highway Lighting
Ramp Closure
Wednesday (9/22) 3 a.m. to 5 a.m., Northbound 183 Toll exit ramp will be closed at Smith Rd. Traffic to use exit ramp at Thompson
Utility Work
Lane Closure
Wednesday-Friday (9/22-9/24) 9 a.m. to 3 p.m., Mobile Ops: US 183 southbound main lane the left lane will be closed from Loyola to MLK Blvd.
Guardrail Work
Ramp Closure
Wednesday-Thursday (9/22-9/23) 9 a.m. to 3 p.m., U-turn(s) at MLK Jr. Blvd. will be closed, not concurrently.
Bridge Construction
Ramp Closure
Wednesday-Thursday (9/22-9/23) 8 p.m. to 6 a.m., Eastbound SH 71 left main lane and East SH 71 to North 183 Toll connector will be closed at E. Riverside Dr.
Roadway Striping
Lane Closure
Wednesday-Friday (9/22-9/24) 8 p.m. to 6 a.m., Southbound 183 Toll will be reduced to one lane from Thompson to SH 71
Roadway Striping
The Mobility Authority sends out E-Newsletters and other announcements to keep neighbors, stakeholders and other interested parties up to date on important activities and events surrounding the construction of this project.