View construction legend
  • Construction Zone
  • Detour
  • Emergency
  • Lane Closure
  • Lane Shift
  • Ramp Closure
  • Road Closure
  • Shoulder Closure
  • Sidewalk Closure
  • Bridge Construction
  • Clearing
  • Drainage Work
  • Excavation
  • Foundation Drilling
  • Guardrail Work
  • Highway Lighting
  • Intersection Work
  • Landscaping
  • Paving
  • Pedestrian Bridge Construction
  • Retaining Wall Construction
  • Roadway Installation
  • Roadway Striping
  • Shared Use Path
  • Sidewalk Work
  • Sign Installation
  • Neighborhood Wall Construction
  • Utility Work
Toggle Traffic Fullscreen
CTRMA

The Central Texas Regional Mobility Authority is building a new tolled expressway with three lanes in each direction on an eight-mile section of US 183 between US 290 and SH 71. In addition, the Mobility Authority will be reconstructing and improving the non-tolled US 183 general purpose lanes and adding $25 million worth of pedestrian and bicyclist facilities. The project will open in phases between 2019 and 2020, offering greater mobility for all users of the corridor.

Sign Up for Construction Alerts
Construction Activity
  • Road Closure
    4/25 to 1/25

    The Texas turnarounds in both directions at Manor/Springdale will be closed for retaining wall and bridge construction. Drivers wishing to complete a turnaround movement will be able to do so at the signalized intersections instead. This closure is anticipated to last about 6 to 9 months.

    Bridge Construction
  • Lane Closure
    5/19 to 12/31

    The US 183 southbound frontage road between US 290 and Manor/Springdale Road is reduced to one lane for several months.

    Roadway Base Installation
  • Lane Closure
    5/19 to 12/31

    The US 183 northbound frontage road between the exit for Manor Road and US 290 is reduced to one lane for several months.

    Roadway Base Installation
  • Detour
    5/31 to 9/30

    Purple Sage Dr will be closed at the northbound US 183 Frontage Road for several months. Traffic will detour via Manor Road, Pecan Brook Drive, and Tumbleweed Drive. Click here for Detour Map - http://bit.ly/1XxmDYL

    Roadway Base Installation
  • Lane Closure
    7/10 to 1/31

    Starting 7/10 at 3pm, Manor/Springdale Road between Susquehanna Lane (Winn Elementary) and Pecan Brook Drive will be reduced to one lane for several months.

    Bridge Construction
  • Lane Closure
    8/28 to 9/2

    Sunday (8/28) from 6 pm to 6 am and Monday through Thursday (8/29-9/1) from 8 pm to 6 am, the US 183 northbound mainlanes will be reduced to one lane between Boggy Creek and Manor/Springdale Road.

    Guardrail Work
  • Lane Closure
    8/28 to 9/2

    Sunday (8/28) from 6 pm to 6 am and Monday through Thursday (8/29-9/1) from 8 pm to 6 am, the US 183 southbound mainlanes will be reduced to one lane between US 290 and Technicenter Drive.

    Roadway Striping
  • Lane Closure
    9/1 to 9/2

    Thursday (9/1) from 8 pm to 6 am, the US 183 southbound frontage road will be reduced to one lane between Manor/Springdale Road and Loyola Lane.

    Utility Work
  • Road Closure
    9/8 to 9/9

    Thursday (9/8) from 8 pm to 6 am, Susquehanna Lane will be CLOSED between Manor Road and Dubuque Lane. Local traffic (residents) may access Susquehanna Lane. All other traffic will detour via Rockhurst Lane. Workers will be tying in a water line.

    Utility Work
See all construction alerts >

Project Photos

Project Web Cameras

View ongoing construction >
4/25/2016 - 1/25/2017

The Texas turnarounds in both directions at Manor/Springdale will be closed for retaining wall and bridge construction. Drivers wishing to complete a turnaround movement will be able to do so at the signalized intersections instead. This closure is anticipated to last about 6 to 9 months.

More >

Workers will be starting bridge construction efforts at this location.

More >
5/19/2016 - 12/31/2016

The US 183 southbound frontage road between US 290 and Manor/Springdale Road is reduced to one lane for several months.

More >
5/19/2016 - 12/31/2016

The US 183 northbound frontage road between the exit for Manor Road and US 290 is reduced to one lane for several months.

More >
5/31/2016 - 9/30/2016

Purple Sage Dr will be closed at the northbound US 183 Frontage Road for several months. Traffic will detour via Manor Road, Pecan Brook Drive, and Tumbleweed Drive. Click here for Detour Map - http://bit.ly/1XxmDYL

More >

Construction of the future upgraded general purpose lanes will begin at this location and it will be built in phases.

More >
7/10/2016 - 1/31/2017

Starting 7/10 at 3pm, Manor/Springdale Road between Susquehanna Lane (Winn Elementary) and Pecan Brook Drive will be reduced to one lane for several months.

More >

Workers will be widening the US 183 bridge over Manor/Springdale Road

More >
8/28/2016 - 9/2/2016

Sunday (8/28) from 6 pm to 6 am and Monday through Thursday (8/29-9/1) from 8 pm to 6 am, the US 183 northbound mainlanes will be reduced to one lane between Boggy Creek and Manor/Springdale Road.

More >
8/28/2016 - 9/2/2016

Sunday (8/28) from 6 pm to 6 am and Monday through Thursday (8/29-9/1) from 8 pm to 6 am, the US 183 southbound mainlanes will be reduced to one lane between US 290 and Technicenter Drive.

More >
9/1/2016 - 9/2/2016

Thursday (9/1) from 8 pm to 6 am, the US 183 southbound frontage road will be reduced to one lane between Manor/Springdale Road and Loyola Lane.

More >
9/8/2016 - 9/9/2016

Thursday (9/8) from 8 pm to 6 am, Susquehanna Lane will be CLOSED between Manor Road and Dubuque Lane. Local traffic (residents) may access Susquehanna Lane. All other traffic will detour via Rockhurst Lane. Workers will be tying in a water line.

More >

Workers will be tying in a water line.

More >