View construction legend
  • Construction Zone
  • Detour
  • Emergency
  • Lane Closure
  • Lane Shift
  • Ramp Closure
  • Road Closure
  • Shoulder Closure
  • Sidewalk Closure
  • Bridge Construction
  • Clearing
  • Drainage Work
  • Excavation
  • Foundation Drilling
  • Guardrail Work
  • Highway Lighting
  • Intersection Work
  • Landscaping
  • Paving
  • Pedestrain Bridge Construction
  • Retaining Wall Construction
  • Roadway Installation
  • Roadway Striping
  • Shared Use Path
  • Sidewalk Work
  • Sign Installation
  • Sound Wall Construction
  • Utility Work
Toggle Traffic Fullscreen
CTRMA

The Central Texas Regional Mobility Authority is building a new tolled expressway with three lanes in each direction on an eight-mile section of US 183 between US 290 and SH 71. In addition, the Mobility Authority will be reconstructing and improving the non-tolled US 183 general purpose lanes and adding $25 million worth of pedestrian and bicyclist facilities. The project will open in phases between 2019 and 2020, offering greater mobility for all users of the corridor.

Sign Up for Construction Alerts
Construction Activity
  • Road Closure
    4/25 to 1/25

    The Texas turnarounds in both directions at Manor/Springdale will be closed for retaining wall and bridge construction. Drivers wishing to complete a turnaround movement will be able to do so at the signalized intersections instead. This closure is anticipated to last about 6 to 9 months.

    Bridge Construction
  • Lane Closure
    5/1 to 5/5

    Sunday from 6 pm to 6 am and Monday-Thursday from 8 pm to 6 am, Manor/Springdale Road will have one lane closed in each direction between the southbound US 183 and the northbound US 183 frontage roads

    Bridge Construction
  • Lane Closure
    5/1 to 5/5

    Sunday from 6 pm to 6 am and Monday-Thursday from 8 pm to 6 am, the US 183 southbound mainlanes will be reduced to one lane from Spingdale/Manor Road to the Colorado River Bridge

    Guardrail Work
See all construction alerts >

Project Photos

Project Web Cameras

View ongoing construction >
5/10/2016

Purple Sage Dr will be closed at the northbound US 183 Frontage Road for several months. Traffic will detour via Manor Road, Pecan Brook Drive, and Tumbleweed Drive. Click here for Detour Map - http://bit.ly/1XxmDYL

More >

Construction of the future upgraded general purpose lanes will begin at this location and it will be built in phases.

More >
5/1/2016 - 5/5/2016

Sunday from 6 pm to 6 am and Monday-Thursday from 8 pm to 6 am, Manor/Springdale Road will have one lane closed in each direction between the southbound US 183 and the northbound US 183 frontage roads

More >

Workers will be removing a concrete coating from the Springdale Road bridge at US 183 in preparation for expansion of the bridge.

More >
5/1/2016 - 5/5/2016

Sunday from 6 pm to 6 am and Monday-Thursday from 8 pm to 6 am, the US 183 southbound mainlanes will be reduced to one lane from Spingdale/Manor Road to the Colorado River Bridge

More >

Workers will be installing guardrail/concrete barrier and restriping the roadway in preparation for construction

More >
4/25/2016 - 1/25/2017

The Texas turnarounds in both directions at Manor/Springdale will be closed for retaining wall and bridge construction. Drivers wishing to complete a turnaround movement will be able to do so at the signalized intersections instead. This closure is anticipated to last about 6 to 9 months.

More >

Workers will be starting bridge construction efforts at this location.

More >