Lane Closure: US 183 Southbound general purpose Right lane closed from US 290 to Manor/Springdale
Lane Closure | Sound Wall Construction

Lane Closure
Monday – Friday(8:30AM-3PM), US 183 Southbound right general purpose lane will be closed from US 290 to Manor Springdale Road.

Sound Wall Construction

12/10/18 to 12/14/18
LANE CLOSURE: US 183 Northbound Right Lane frontage road closed from US 290 to Manor/Springdale
Lane Closure | Landscaping

Lane Closure
Monday – Friday (9AM-3PM), US 183 Northbound Right general purpose lane will be closed from US 290 to Manor Springdale Road.

Landscaping

12/10/18 to 12/14/18
Lane Closure: US 183 Northbound Right general purpose lane closed from MLK Blvd. to 51st Street
Lane Closure | Shared Use Path

Lane Closure
Monday-Friday (9AM-3PM), US 183 Northbound Right general purpose lane will be closed from MLK Blvd. to 51st Street.

Shared Use Path

12/10/18 to 12/14/18
Lane Closure: US 183 various closures in both directions at Manor/Springdale
Lane Closure | Intersection Work

Lane Closure
Monday – Friday (9AM-3PM), Manor Springdale Road there will be various closures in both directions. Movement in all directions will be maintained.

Intersection Work

12/10/18 to 12/15/18
Lane Closure: US 183 Left lane closed in both directions from Loyola Lane to MLK Blvd.
Lane Closure | Pedestrian Bridge Construction

Lane Closure

Pedestrian Bridge Construction
Monday – Thursday (12/10–12/13) 8PM-6AM and Friday (12/14) from 8PM-10AM, US 183 Left main lane will be closed in both directions from Loyola Lane to MLK Blvd.

Long Term

2/8/18 to 4/5/19
Loyola Lane Crossing at US 183 Closed
Road Closure | Excavation

Road Closure
The Loyola Lane crossing at US 183 is closed through early 2019.

Excavation
The Loyola Lane crossing at US 183 is closed through early 2019.

4/16/18 to 4/1/19
ROAD CLOSURES: Smith Road and Thurgood Avenue Closed at US 183 Southbound
Road Closure | Roadway Base Installation

Road Closure
Continuously from Monday (4/16/2018) at 9 am to Monday (4/1/2019) at 5 pm, Smith Road, west of US 183, and Thurgood Avenue will be closed at the US 183 southbound mainlanes. Follow signed detours.

Roadway Base Installation

6/15/18 to 4/1/19
ROAD CLOSURE: Montopolis Drive
Road Closure | Roadway Base Installation

Road Closure
Montopolis Drive is closed at US 183 through early 2019. Follow signed detour.

Roadway Base Installation
Montopolis Drive is closed at US 183 through early 2019. Follow signed detour.

6/15/18 to 4/1/19
ROAD CLOSURE: EASTGATE
Road Closure | Roadway Base Installation

Road Closure
Continuously between Thursday, June 1, 2018 at 6 am until Monday, April 1, 2019 at 6 am, Eastgate will be closed at the US 183 southbound mainlanes. Follow signed detour.

Roadway Base Installation

7/30/18 to 12/31/18
ROAD CLOSURE: Tracor Lane and Marcel Gres at US 183
Road Closure | Utility Work

Road Closure
Continuously through late December 2018, at 6 am, Tracor Lane and Marcel Gres will be closed at US 183.

Utility Work

7/30/18 to 12/31/18
LANE REDUCTION: 51st Street West of US 183
Lane Closure | Roadway Base Installation

Lane Closure
Continuously through December 2018, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

Roadway Base Installation

7/30/18 to 12/31/18
ROAD CLOSURE: Central Avenue & Bluestein Drive
Road Closure | Utility Work

Road Closure
Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work and will remain closed through 2018. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

Utility Work

8/26/18 to 8/12/19
RAMP CLOSURE: SH 71 Westbound to US 183 Southbound
Ramp Closure | Bridge Construction

Ramp Closure
Beginning as early as Sunday, August 26, at 6 pm and lasting approximately 10-12 months, the SH 71 westbound exit ramp to US 183 southbound will be closed. Detour by exiting for the U-turn at E. Riverside Drive and heading eastbound on SH 71 to the US 183 southbound exit.

Bridge Construction

9/4/18 to 8/31/19
ROAD CLOSURE: US 183 Southbound to US 183 Northbound U-Turn at Levander Loop
Road Closure | Bridge Construction

Road Closure
Continuously through August 2019, the US 183 southbound to US 183 northbound U-Turn will be closed at Levander Loop. Follow the signed detour.

Bridge Construction

10/11/18 to 3/31/20
PERMANENT CROSSING CLOSURE: 51st Street at US 183
Road Closure

Road Closure
The signalized crossing of US 183 at 51st Street is permanently closed and the traffic signal has been removed. Drivers must utilize the U-turns at MLK and Manor/Springdale Road as an alternative to cross over US 183.

10/15/18 to 10/1/20
PERMANENT CROSSING CLOSURE: CENTRAL AVE AT US 183
Road Closure | Intersection Work

Road Closure
The crossing of US 183 at Central Ave will permanently close. Drivers will instead use the U-turns at MLK and Bolm Road to reach the other side of US 183.

Intersection Work

10/15/18 to 10/1/20
PERMANENT CROSSING CLOSURE: Hudson Street crossing of US 183
Road Closure | Intersection Work

Road Closure
The crossing of US 183 at Hudson Street will permanently close. Drivers will instead use the U-turns at MLK and Bolm Road to reach the other side of US 183.

Intersection Work

10/15/18 to 10/1/20
PERMANENT CROSSING CLOSURE: TECHNICENTER AT US 183
Road Closure | Intersection Work

Road Closure
The TechniCenter Drive crossing at US 183 will be permanently closed

Intersection Work

11/5/18 to 3/31/20
PERMANENT UNDERPASS CLOSURE: Bolm Road at US 183
Road Closure | Roadway Base Installation

Road Closure
The US 183 underpass at Bolm Road will CLOSE PERMANENTLY to eastbound and westbound cross traffic and the traffic signal will be removed. Bolm Road eastbound traffic will detour via the south to north U-turn at Levander Loop to access US 183 northbound. Bolm Road westbound traffic will detour via a new temporary north to south U-turn located just north of Bolm Road to access US 183 Southbound

Roadway Base Installation

Sign Up For Our Newsletter

The Mobility Authority sends out E-Newsletters and other announcements to keep neighbors, stakeholders and other interested parties up to date on important activities and events surrounding the construction of this project.