Travel Information

Short Term

5/20/18 to 5/21/18
BRIDGE CLOSURE: Montopolis Bridge
Road Closure | Highway Lighting

Road Closure
Sunday (5/20) from 6 pm to 6 am, the US 183 southbound mainlanes on the historic Montopolis Truss Bridge will be closed. All traffic will detour to Shady Lane and take the southbound 7th Street bridge to US 183 southbound. Expect Delays. If traveling to the airport, plan ahead.

Highway Lighting

5/21/18 to 6/1/18
LANE REDUCTION: Southbound US 183 Frontage Road from US 290 to Manor/Springdale
Lane Closure | Sound Wall Construction

Lane Closure
Monday through Thursday (5/21-24) and Tuesday through Friday (5/29-6/1) from 9 am to 4 pm, the US 183 southbound frontage road will be reduced by one lane from US 290 to Manor/Springdale Road.

Sound Wall Construction

5/21/18 to 5/25/18
ROAD CLOSURE: US 183 Southbound north of the River
Road Closure | Bridge Construction

Road Closure
Monday through Thursday (5/21-24) from 8 pm to 6 am, the US 183 southbound mainlanes will be closed at the Colorado River. Detour by exiting at Bolm Road and follow detour signs along Levander Loop to reach Airport Blvd. From there, take the Airport Blvd entrance ramp to US 183 southbound. Expect Delays. If traveling to the airport for an early morning flight, plan ahead.

Bridge Construction

5/21/18 to 5/25/18
MAJOR ACTIVITY AT US 183 AND MLK
Construction Zone | Bridge Construction

Construction Zone
Monday through Thursday (5/21-24) from 8 pm to 6 am, there will be major construction activity at US 183 and MLK Jr. Blvd. On Monday and Tuesday, the US 183 northbound mainlanes will be closed; traffic to detour by exiting for MLK Jr. Blvd, traveling through the signaled intersection to the entrance ramp to US 183 northbound. On Wednesday and Thursday, the US 183 southbound mainlanes will be closed; traffic to detour by exiting for MLK Jr. Blvd, traveling through the signaled intersection to the entrance ramp to US 183 southbound. On all four days of this activity, MLK Jr. Blvd will be closed in both directions over US 183. Eastbound traffic will detour on US 183 to turn around at TechniCenter Drive; westbound traffic will detour on US 183 to turn around at 51st Street. Expect delays.

Bridge Construction

5/22/18 to 5/23/18
ROAD CLOSURE: US 183 at SH 71
Road Closure | Bridge Construction

Road Closure
Tuesday (5/22) from 8 pm to 6 am, southbound US 183 at SH 71 will be closed. All southbound traffic will detour by exiting for westbound SH 71, taking the u-turn at E. Riverside Drive, and heading eastbound on SH 71 to the US 183 southbound exit. Expect Delays. If heading to the airport in the late evening/early morning, please plan ahead.

Bridge Construction

Long Term

4/16/18 to 4/1/19
ROAD CLOSURES: Smith Road and Thurgood Avenue Closed at US 183 Southbound
Road Closure | Roadway Base Installation

Road Closure
Continuously from Monday (4/16/2018) at 9 am to Monday (4/1/2019) at 5 pm, Smith Road, west of US 183, and Thurgood Avenue will be closed at the US 183 southbound mainlanes. Follow signed detours.

Roadway Base Installation

4/28/18 to 6/29/18
ROAD CLOSURE: Vargas Road
Road Closure | Roadway Base Installation

Road Closure
Continuously from Saturday, April 28, at 11 am, to Friday, June 29, at 6 am, eastbound Vargas Road will be closed at US 183. Vargas traffic heading to US 183 northbound will detour via Ponca Street and Montopolis Drive to US 183. Vargas traffic heading to US southbound will take westbound Vargas Street to Riverside Drive and head south to SH 71 eastbound, then take the US southbound ramp.

Roadway Base Installation

5/11/18 to 12/30/19
ROAD CLOSURE: Central Avenue & Bluestein Drive
Road Closure | Utility Work

Road Closure
Starting April 25, 2017, and lasting till late December 2018, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

Utility Work

5/11/18 to 12/30/19
ROAD CLOSURE: Levander Loop at the US 183 Northbound Turnaround
Road Closure | Bridge Construction

Road Closure
Continuously between Friday June 5, 2017 at 8 pm to late December 2018, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

Bridge Construction

5/11/18 to 12/30/19
ROAD CLOSURE: Tracor Lane and Marcel Gress at US 183
Road Closure | Utility Work

Road Closure
Continuously from Saturday, January 13, 2017, at 7 am, to late December 2018, at 6 am, Tracor Lane and Marcel Gress will be closed at US 183.

Utility Work

5/11/18 to 12/30/20
LANE REDUCTION: 51st Street West of US 183
Lane Closure | Roadway Base Installation

Lane Closure
Continuously from Friday (8/17/2017) at 8 pm to late December 2018, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

Roadway Base Installation

Sign Up For Our Newsletter

The Mobility Authority sends out E-Newsletters and other announcements to keep neighbors, stakeholders and other interested parties up to date on important activities and events surrounding the construction of this project.