Travel Information

Short Term

5/16/21 to 5/17/21
RAMP CLOSURE: Eastbound SH 71 to northbound US 183 cloverleaf
Ramp Closure | Paving

Ramp Closure
Sunday (5/16) 6 p.m. to 6 a.m., Monday (5/17) 8 p.m. to 6 p.m., Eastbound SH 71 to northbound US 183 cloverleaf will be closed at SH 71. Detour via Spirit of Texas Dr.

Paving

5/16/21 to 5/18/21
RAMP CLOSURE: US 183 northbound mainlane and east SH 71 to north US 183 cloverleaf at SH 71.
Ramp Closure | Guardrail Work

Ramp Closure
Sunday (5/16) & Tuesday (5/18) 8 p.m. to 6 a.m., US 183 northbound mainlane and east SH 71 to north US 183 cloverleaf will be closed at SH 71. Detour via Spirit of Texas Dr.

Guardrail Work

5/16/21 to 5/17/21
LANE CLOSURE: Eastbound SH 71 two right mainlanes US 183 to Brandt Dr.
Lane Closure | Guardrail Work

Lane Closure
Sunday (5/16) 8 p.m. to 6 a.m., Eastbound SH 71 two right mainlanes will be closed from US 183 to Brandt Dr.

Guardrail Work

5/17/21 to 5/21/21
LANE CLOSURE: Eastbound Loyola right lane will be closed at US 183
Lane Closure | Guardrail Work

Lane Closure
Monday-Friday (5/17-5/21) 9 a.m. to 3 p.m., Eastbound Loyola right lane will be closed at US 183.

Guardrail Work

5/17/21 to 5/21/21
LANE CLOSURE: US 183 left lane in both directions at Montopolis.
Lane Closure | Guardrail Work

Lane Closure
Monday-Friday (5/17-5/21) 9 a.m. to 3 p.m., US 183 left lane in both directions will be closed at Montopolis.

Guardrail Work

5/17/21 to 5/21/21
LANE CLOSURE: US 183 right lane in both directions 51st to Manor Springdale.
Lane Closure | Guardrail Work

Lane Closure
Monday-Friday (5/17-5/21) 9 a.m. to 3 p.m., US 183 right lane in both directions will be closed from 51st to Manor Springdale.

Guardrail Work

5/17/21 to 5/17/21
LANE CLOSURE: US 183 northbound left mainlane at Montopolis Dr.
Lane Closure | Landscaping

Lane Closure
Monday (5/17) 9 a.m. to 3 p.m., US 183 northbound left mainlane will be closed at Montopolis Dr.

Landscaping

5/17/21 to 5/19/21
LANE CLOSURE: US 183 southbound right mainlane Montopolis to Patton.
Lane Closure | Sign Installation

Lane Closure
Monday-Wednesday (5/17-5/19) 9 a.m. to 3 p.m., US 183 southbound right mainlane will be closed from Montopolis to Patton.

Sign Installation

5/17/21 to 5/18/21
RAMP CLOSURE: Westbound SH 71 to northbound US183
Ramp Closure | Paving

Ramp Closure
Monday-Tuesday (5/17-5/18) 8 p.m. to 6 a.m., Westbound SH 71 to northbound US183 will be closed at SH 71 Detour via E. Riverside Dr. U-turn to southbound US 183.

Paving

5/17/21 to 5/18/21
ROAD CLOSURE: Northbound US 183 to Westbound SH 71
Road Closure | Paving

Road Closure
Monday-Tuesday (5/17-5/18) 8 p.m. to 6 a.m., Northbound US 183 to Westbound SH 71 to will be closed at US 183. Detour via Montopolis Dr U-turn to south US 183 to SH 71.

Paving

5/17/21 to 5/19/21
LANE CLOSURE: Westbound SH 71 mainlane will be reduced to one lane Brandt Dr. to US183.
Lane Closure | Paving

Lane Closure
Monday-Tuesday (5/17-5/18) 8 p.m. to 6 a.m., Westbound SH 71 mainlane will be reduced to one lane from Brandt Dr. to US183.

Paving

5/17/21 to 5/19/21
LANE CLOSURE: Northbound US 183 general-purpose lanes Old Bastrop Hwy. to Patton Ave.
Lane Closure | Paving

Lane Closure
Monday-Tuesday (5/17-5/18) 8 p.m. to 6 a.m., Northbound US 183 general-purpose lanes will be closed from Old Bastrop Hwy. to Patton Ave. To access Old Bastrop Highway from US 183, use southbound US 183, exit to eastbound SH 71, U-turn at Spirit of Texas Highway. Old Bastrop Highway will be on the right. Use Patton Avenue to access Jet Lane.

Paving

5/17/21 to 5/22/21
ROAD CLOSURE: US 183 northbound general-purpose at Bolm Rd.
Road Closure | Pedestrian Bridge Construction

Road Closure
Monday-Friday (5/17-5/21) 8 p.m. to 6 a.m., US 183 northbound general-purpose road will be closed at Bolm Rd. There will be nightly closures of the northbound US 183 general-purpose lanes between Howard Road and south of Smith Road, due to work on the pedestrian bridge at Bolm Road. Non-tolled traffic will be detoured onto the 183 Toll Road north of the Colorado River and then exit immediately to rejoin the general-purpose lanes via the exit signed for Techni Center Drive. Tolls will NOT be charged on this section of the road during the closures.

Pedestrian Bridge Construction

5/18/21 to 6/1/21
CONTINUOUS ROAD CLOSURE: US 183 northbound frontage road will be reduced to one lane Manor Springdale to US 290.
Lane Closure | Guardrail Work

Lane Closure
Tuesday (5/18) at 9 a.m. until Tuesday (6/1) at 3 p.m., US 183 northbound frontage road will be reduced to one lane from Manor Springdale to US 290.

Guardrail Work