View construction legend
  • Construction Zone
  • Detour
  • Emergency
  • Lane Closure
  • Lane Shift
  • Ramp Closure
  • Road Closure
  • Shoulder Closure
  • Sidewalk Closure
  • Bridge Construction
  • Clearing
  • Drainage Work
  • Excavation
  • Foundation Drilling
  • Guardrail Work
  • Highway Lighting
  • Intersection Work
  • Landscaping
  • Paving
  • Pedestrian Bridge Construction
  • Retaining Wall Construction
  • Roadway Base Installation
  • Roadway Striping
  • Shared Use Path
  • Sidewalk Work
  • Sign Installation
  • Sound Wall Construction
  • Utility Work
Toggle Traffic Fullscreen
4/25/2017 - 4/30/2018

Starting April 25, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work and will remain closed for approximately 12 months. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

More >
6/5/2017 - 5/25/2018

Continuously between Friday June 5 at 8 pm to May 2018, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

More >
9/7/2017 - 10/30/2017

Beginning Thursday, September 6, till late October, Loyola Lane east of US 183 will be reduced to one lane in each direction between US 183 and Millrace. To facilitate this change, the second turn lane from US 183 southbound to Loyola Lane will be closed. Expect travel delays.

More >
10/6/2017 - 12/22/2017

Continuously from Friday (8/17) at 8 pm to the morning of December 22, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

More >
10/16/2017 - 10/21/2017

Continuously between Monday, October 16, at 7 am to Saturday, October 21, at 7 pm, Montopolis Drive in both directions will be reduced to one lane between US 183 and Monsanto Drive.

More >
10/16/2017 - 10/21/2017

Monday through Friday (10/16-20) from 8 pm to 6 am, the exit to Airport Boulevard, Cesar Chavez, 5th, and 7th Street from northbound US 183 WILL BE CLOSED. Follow signed detour.

More >
10/20/2017 - 10/28/2017

Friday (10/20) from 10 pm to 6 am, Monday through Thursday (10/23-26) from 8 pm to 6 am, and Friday (10/27) from 10 pm to 6 am, the US 183 southbound mainlanes will be closed between Hudson Street and Montopolis Drive. Traffic will detour by exiting at Bolm Road, traveling through Levander Loop to Airport Drive, taking Airport Drive to the Montopolis/US 183 bridge and onward to southbound US 183. Expect Delays.

More >

The Central Texas Regional Mobility Authority is building a new tolled expressway with three lanes in each direction on an eight-mile section of US 183 between US 290 and SH 71.

In addition, the Mobility Authority will be reconstructing and improving the non-tolled US 183 general purpose lanes and adding $25 million worth of pedestrian and bicyclist facilities. The project will open in phases between 2019 and 2020, offering greater mobility for all users of the corridor.

Sign Up for Construction Alerts We're Hiring! Check out our job opportunities
Construction Activity

Short Term

  • Lane Closure
    10/16/17 to 10/21/17

    Continuously between Monday, October 16, at 7 am to Saturday, October 21, at 7 pm, Montopolis Drive in both directions will be reduced to one lane between US 183 and Monsanto Drive.

    Roadway Base Installation
  • Lane Closure
    10/16/17 to 10/21/17

    Monday through Friday (10/16-20) from 8 pm to 6 am, the exit to Airport Boulevard, Cesar Chavez, 5th, and 7th Street from northbound US 183 WILL BE CLOSED. Follow signed detour.

    Bridge Construction
  • Road Closure
    10/20/17 to 10/28/17

    Friday (10/20) from 10 pm to 6 am, Monday through Thursday (10/23-26) from 8 pm to 6 am, and Friday (10/27) from 10 pm to 6 am, the US 183 southbound mainlanes will be closed between Hudson Street and Montopolis Drive. Traffic will detour by exiting at Bolm Road, traveling through Levander Loop to Airport Drive, taking Airport Drive to the Montopolis/US 183 bridge and onward to southbound US 183. Expect Delays.

    Bridge Construction

Long Term

  • Road Closure
    4/25/17 to 4/30/18

    Starting April 25, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work and will remain closed for approximately 12 months. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

    Utility Work
  • Road Closure
    6/5/17 to 5/25/18

    Continuously between Friday June 5 at 8 pm to May 2018, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

    Bridge Construction
  • Construction Zone
    9/7/17 to 10/30/17

    Beginning Thursday, September 6, till late October, Loyola Lane east of US 183 will be reduced to one lane in each direction between US 183 and Millrace. To facilitate this change, the second turn lane from US 183 southbound to Loyola Lane will be closed. Expect travel delays.

    Roadway Base Installation
  • Lane Closure
    10/6/17 to 12/22/17

    Continuously from Friday (8/17) at 8 pm to the morning of December 22, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

    Roadway Base Installation
See all construction alerts >