View construction legend
  • Construction Zone
  • Detour
  • Emergency
  • Lane Closure
  • Lane Shift
  • Ramp Closure
  • Road Closure
  • Shoulder Closure
  • Sidewalk Closure
  • Bridge Construction
  • Clearing
  • Drainage Work
  • Excavation
  • Foundation Drilling
  • Guardrail Work
  • Highway Lighting
  • Intersection Work
  • Landscaping
  • Paving
  • Pedestrian Bridge Construction
  • Retaining Wall Construction
  • Roadway Base Installation
  • Roadway Striping
  • Shared Use Path
  • Sidewalk Work
  • Sign Installation
  • Sound Wall Construction
  • Utility Work
Toggle Traffic Fullscreen
4/25/2016 - 8/31/2017

The Texas turnarounds in both directions at Manor/Springdale will be closed for retaining wall and bridge construction. Drivers wishing to complete a turnaround movement will be able to do so at the signalized intersections instead.

More >

Workers are rebuilding the US 183 bridge over Manor/Springdale Road.

More >
2/3/2017 - 8/31/2017

A major lane reduction will occur along MLK Blvd. between Tannehill Lane & Regency Drive; the roadway will be reduced to 1 lane in each direction. Drivers passing through this interchange may experience increased travel delays.

More >

This is to accommodate construction of a new wider bridge at US 183. Once a portion of the new bridge is completed, traffic in both directions will be detoured onto the new bridge so demolition of the old bridge can take place, and the remainder of the new bridge can be constructed.

More >
4/25/2017 - 4/30/2018

Starting April 25, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work and will remain closed for approximately 12 months. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

More >
6/5/2017 - 9/8/2017

Continuously between Friday June 5 at 8 pm to Friday September 8 at 6 am, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

More >
6/26/2017 - 12/31/2020

Beginning Monday June 26 at 9 am, the westbound to eastbound u-turn, or turnaround, on SH 71 at the intersection with US 183 near The Parking Spot and Gatti’s Pizza WILL BE PERMANENTLY CLOSED. Traffic will be routed to the recently completed u-turn at Riverside Drive.

More >
7/17/2017 - 8/26/2017

Continuously between Monday July 17 at 7 am and Saturday August 26 at 6 pm, North Del Monte will be closed at Montopolis Drive. Detour via Walker Lane.

More >
8/11/2017 - 8/19/2017

Friday (8/11) and Monday through Friday (8/14-18) from 8 pm to 6 am, the exit to Airport Boulevard, Cesar Chavez, 5th, and 7th Street from northbound US 183 WILL BE CLOSED. Follow signed detour.

More >
8/11/2017 - 8/19/2017

Friday (8/11) from 8 pm to 6 am, Sunday (8/13) from 6 pm to 6 am, Monday through Thursday (8/14-17) from 8 pm to 6 am, Friday (8/18) from 8 pm to 10 am, and Saturday (8/19) from 6 pm to 10 am, Manor/Springdale Road in both directions will be reduced to one lane underneath US 183.

More >
8/12/2017 - 8/19/2017

Friday (8/11) from 8 pm to 6 am, and Monday through Friday (8/14-18) from 8 pm to 6 am, US 183 will be temporarily closed underneath the MLK Jr., Blvd overpass. Traffic will exit at the MLK Jr., Blvd ramps and proceed through the traffic signals.

More >
8/17/2017 - 8/18/2017

Thursday (8/17) from 7 am till Friday (8/18) at 6 pm, Smith Road will have one lane closed from Howard Road to Alleyton Drive. Smith Road to Howard Street will remain open for access.

More >
8/17/2017 - 10/9/2017

Continuously from Friday (8/17) at 8 pm to the morning of October 9, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

More >
8/17/2017 - 8/19/2017

Thursday and Friday (8/17-18) from 8 pm to 6 am, Manor/Springdale Road in both directions will be closed underneath US 183. Follow signed detours.

More >

The Central Texas Regional Mobility Authority is building a new tolled expressway with three lanes in each direction on an eight-mile section of US 183 between US 290 and SH 71.

In addition, the Mobility Authority will be reconstructing and improving the non-tolled US 183 general purpose lanes and adding $25 million worth of pedestrian and bicyclist facilities. The project will open in phases between 2019 and 2020, offering greater mobility for all users of the corridor.

Sign Up for Construction Alerts We're Hiring! Check out our job opportunities
Construction Activity

Short Term

  • Lane Closure
    8/11/17 to 8/19/17

    Friday (8/11) and Monday through Friday (8/14-18) from 8 pm to 6 am, the exit to Airport Boulevard, Cesar Chavez, 5th, and 7th Street from northbound US 183 WILL BE CLOSED. Follow signed detour.

    Bridge Construction
  • Lane Closure
    8/11/17 to 8/19/17

    Friday (8/11) from 8 pm to 6 am, Sunday (8/13) from 6 pm to 6 am, Monday through Thursday (8/14-17) from 8 pm to 6 am, Friday (8/18) from 8 pm to 10 am, and Saturday (8/19) from 6 pm to 10 am, Manor/Springdale Road in both directions will be reduced to one lane underneath US 183.

    Bridge Construction
  • Road Closure
    8/12/17 to 8/19/17

    Friday (8/11) from 8 pm to 6 am, and Monday through Friday (8/14-18) from 8 pm to 6 am, US 183 will be temporarily closed underneath the MLK Jr., Blvd overpass. Traffic will exit at the MLK Jr., Blvd ramps and proceed through the traffic signals.

    Bridge Construction
  • Road Closure
    8/17/17 to 8/18/17

    Thursday (8/17) from 7 am till Friday (8/18) at 6 pm, Smith Road will have one lane closed from Howard Road to Alleyton Drive. Smith Road to Howard Street will remain open for access.

    Utility Work
  • Road Closure
    8/17/17 to 8/19/17

    Thursday and Friday (8/17-18) from 8 pm to 6 am, Manor/Springdale Road in both directions will be closed underneath US 183. Follow signed detours.

    Bridge Construction

Long Term

  • Road Closure
    4/25/16 to 8/31/17

    The Texas turnarounds in both directions at Manor/Springdale will be closed for retaining wall and bridge construction. Drivers wishing to complete a turnaround movement will be able to do so at the signalized intersections instead.

    Bridge Construction
  • Lane Closure
    2/3/17 to 8/31/17

    A major lane reduction will occur along MLK Blvd. between Tannehill Lane & Regency Drive; the roadway will be reduced to 1 lane in each direction. Drivers passing through this interchange may experience increased travel delays.

    Bridge Construction
  • Road Closure
    4/25/17 to 4/30/18

    Starting April 25, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work and will remain closed for approximately 12 months. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

    Utility Work
  • Road Closure
    6/5/17 to 9/8/17

    Continuously between Friday June 5 at 8 pm to Friday September 8 at 6 am, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

    Bridge Construction
  • Road Closure
    6/26/17 to 12/31/20

    Beginning Monday June 26 at 9 am, the westbound to eastbound u-turn, or turnaround, on SH 71 at the intersection with US 183 near The Parking Spot and Gatti’s Pizza WILL BE PERMANENTLY CLOSED. Traffic will be routed to the recently completed u-turn at Riverside Drive.

    Roadway Base Installation
  • Road Closure
    7/17/17 to 8/26/17

    Continuously between Monday July 17 at 7 am and Saturday August 26 at 6 pm, North Del Monte will be closed at Montopolis Drive. Detour via Walker Lane.

    Utility Work
  • Lane Closure
    8/17/17 to 10/9/17

    Continuously from Friday (8/17) at 8 pm to the morning of October 9, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

    Roadway Base Installation