View construction legend
  • Construction Zone
  • Detour
  • Emergency
  • Lane Closure
  • Lane Shift
  • Ramp Closure
  • Road Closure
  • Shoulder Closure
  • Sidewalk Closure
  • Bridge Construction
  • Clearing
  • Drainage Work
  • Excavation
  • Foundation Drilling
  • Guardrail Work
  • Highway Lighting
  • Intersection Work
  • Landscaping
  • Paving
  • Pedestrian Bridge Construction
  • Retaining Wall Construction
  • Roadway Base Installation
  • Roadway Striping
  • Shared Use Path
  • Sidewalk Work
  • Sign Installation
  • Sound Wall Construction
  • Utility Work
Toggle Traffic Fullscreen
4/25/2017 - 4/30/2018

Starting April 25, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work and will remain closed for approximately 12 months. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

More >
6/6/2017 - 5/25/2018

Continuously between Friday June 5 at 8 pm to May 2018, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

More >
1/13/2018 - 10/26/2018

Continuously from Saturday, January 13, at 7 am, to Friday, October 26, at 6 am, Tracor Lane and Marcel Gress will be closed at US 183.

More >
1/26/2018 - 5/1/2018

Continuously from Friday (8/17) at 8 pm to the morning of May 1, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

More >
4/16/2018 - 4/1/2019

Continuously from Monday (4/16/2018) at 9 am to Monday (4/1/2019) at 5 pm, Smith Road, west of US 183, and Thurgood Avenue will be closed at the US 183 southbound mainlanes. Follow signed detours.

More >
4/21/2018 - 4/25/2018

Friday (4/20) from 8 pm to 10 am and Tuesday (4/24) from 8 pm to 6 am, the US 183 southbound mainlanes will be closed under SH 71 between Thompson Lane and E. Riverside Drive. Also, the SH 71 westbound to US 183 southbound ramp will be closed. All traffic will detour to the u-turn at E. Riverside Drive and SH 71.

More >
4/24/2018 - 4/28/2018

Monday (4/23), Wednesday (4/25), and Thursday (4/26) from 8 pm to 6 am, and Friday (4/27) from 8 pm to 10 am, southbound Airport Blvd will be closed between Levander Loop and US 183. Also, the US 183 southbound mainlanes will be closed over the Colorado River. Traffic will detour over 7th Street. Expect Delays. If heading to the airport in the late evening/early morning, please plan ahead.

More >
4/24/2018 - 4/27/2018

Tuesday through Friday (4/24-27) from 9 am to 5 pm, the US 183 northbound frontage road will be reduced by one lane between Manor/Springdale Road and US 290.

More >
4/26/2018 - 4/27/2018

Wednesday through Thursday (4/25-26) from 8 pm to 6 am, the SH 71 westbound mainlanes will be reduced to one lane at US 183.

More >

The Central Texas Regional Mobility Authority is building a new tolled expressway with three lanes in each direction on an eight-mile section of US 183 between US 290 and SH 71.

In addition, the Mobility Authority will be reconstructing and improving the non-tolled US 183 general purpose lanes and adding $25 million worth of pedestrian and bicyclist facilities. The project will open in phases between 2019 and 2020, offering greater mobility for all users of the corridor.

Take Our Aesthetics Survey We're Hiring! Check out our job opportunities Sign Up for Construction Alerts

Construction Activity

Short Term

  • Road Closure
    4/20/18 to 4/25/18

    Friday (4/20) from 8 pm to 10 am and Tuesday (4/24) from 8 pm to 6 am, the US 183 southbound mainlanes will be closed under SH 71 between Thompson Lane and E. Riverside Drive. Also, the SH 71 westbound to US 183 southbound ramp will be closed. All traffic will detour to the u-turn at E. Riverside Drive and SH 71.

    Bridge Construction
  • Road Closure
    4/23/18 to 4/28/18

    Monday (4/23), Wednesday (4/25), and Thursday (4/26) from 8 pm to 6 am, and Friday (4/27) from 8 pm to 10 am, southbound Airport Blvd will be closed between Levander Loop and US 183. Also, the US 183 southbound mainlanes will be closed over the Colorado River. Traffic will detour over 7th Street. Expect Delays. If heading to the airport in the late evening/early morning, please plan ahead.

    Bridge Construction
  • Lane Closure
    4/24/18 to 4/27/18

    Tuesday through Friday (4/24-27) from 9 am to 5 pm, the US 183 northbound frontage road will be reduced by one lane between Manor/Springdale Road and US 290.

    Shared Use Path
  • Lane Closure
    4/25/18 to 4/27/18

    Wednesday through Thursday (4/25-26) from 8 pm to 6 am, the SH 71 westbound mainlanes will be reduced to one lane at US 183.

    Bridge Construction

Long Term

  • Road Closure
    4/25/17 to 4/30/18

    Starting April 25, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work and will remain closed for approximately 12 months. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

    Utility Work
  • Road Closure
    6/5/17 to 5/25/18

    Continuously between Friday June 5 at 8 pm to May 2018, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

    Bridge Construction
  • Road Closure
    1/13/18 to 10/26/18

    Continuously from Saturday, January 13, at 7 am, to Friday, October 26, at 6 am, Tracor Lane and Marcel Gress will be closed at US 183.

    Utility Work
  • Lane Closure
    1/26/18 to 5/1/18

    Continuously from Friday (8/17) at 8 pm to the morning of May 1, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

    Roadway Base Installation
  • Road Closure
    4/16/18 to 4/1/19

    Continuously from Monday (4/16/2018) at 9 am to Monday (4/1/2019) at 5 pm, Smith Road, west of US 183, and Thurgood Avenue will be closed at the US 183 southbound mainlanes. Follow signed detours.

    Roadway Base Installation