Active Traffic Alert
Posted 06/03
MONTOPOLIS DRIVE DETOUR BEGINS JUNE 14

Beginning 6/14 and lasting one year, eastbound Montopolis Drive traffic will detour via a newly constructed section of roadway adjacent to the existing US 183. This detour will facilitate the removal and reconstruction of the existing Montopolis Drive bridge to northbound US 183 (not the steel truss bridge over the Colorado River).

Learn more by clicking here.

View construction legend
  • Construction Zone
  • Detour
  • Emergency
  • Lane Closure
  • Lane Shift
  • Ramp Closure
  • Road Closure
  • Shoulder Closure
  • Sidewalk Closure
  • Bridge Construction
  • Clearing
  • Drainage Work
  • Excavation
  • Foundation Drilling
  • Guardrail Work
  • Highway Lighting
  • Intersection Work
  • Landscaping
  • Paving
  • Pedestrian Bridge Construction
  • Retaining Wall Construction
  • Roadway Base Installation
  • Roadway Striping
  • Shared Use Path
  • Sidewalk Work
  • Sign Installation
  • Sound Wall Construction
  • Utility Work
Toggle Traffic Fullscreen
4/16/2018 - 4/1/2019

Continuously from Monday (4/16/2018) at 9 am to Monday (4/1/2019) at 5 pm, Smith Road, west of US 183, and Thurgood Avenue will be closed at the US 183 southbound mainlanes. Follow signed detours.

More >
5/11/2018 - 12/30/2019

Starting April 25, 2017, and lasting till late December 2018, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

More >
5/11/2018 - 12/30/2019

Continuously between Friday June 5, 2017 at 8 pm to late December 2018, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

More >
5/11/2018 - 12/30/2019

Continuously from Saturday, January 13, 2017, at 7 am, to late December 2018, at 6 am, Tracor Lane and Marcel Gress will be closed at US 183.

More >
5/11/2018 - 12/30/2020

Continuously from Friday (8/17/2017) at 8 pm to late December 2018, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

More >
6/4/2018 - 6/22/2018

Monday through Friday (6/4-8, 11-15, and 18-22) from 9 am to 4 pm, the US 183 southbound frontage road will be closed by one lane between US 290 and Manor/Springdale Road.

More >
6/15/2018 - 4/1/2019

Continuously between Thursday, June 14, 2018 at 8 pm until Monday, April 1, 2019 at 5 pm, Vargas Road will be closed at US 183. Follow signed detour.

More >
6/15/2018 - 4/1/2019

Continuously between Thursday, June 1, 2018 at 6 am until Monday, April 1, 2019 at 6 am, Eastgate will be closed at the US 183 southbound mainlanes. Follow signed detour.

More >
6/20/2018 - 6/21/2018

Wednesday (6/20) from 9 am to 3 pm and from 8 pm to 6 am, the US 183 southbound to northbound U-turn at Levander Loop will be closed. Follow the signed detour along Levander Loop.

More >

The Central Texas Regional Mobility Authority is building a new tolled expressway with three lanes in each direction on an eight-mile section of US 183 between US 290 and SH 71.

In addition, the Mobility Authority will be reconstructing and improving the non-tolled US 183 general purpose lanes and adding $25 million worth of pedestrian and bicyclist facilities. The project will open in phases between 2019 and 2020, offering greater mobility for all users of the corridor.

Take Our Aesthetics Survey We're Hiring! Check out our job opportunities Sign Up for Construction Alerts

Construction Activity

Short Term

  • Lane Closure
    6/4/18 to 6/22/18

    Monday through Friday (6/4-8, 11-15, and 18-22) from 9 am to 4 pm, the US 183 southbound frontage road will be closed by one lane between US 290 and Manor/Springdale Road.

    Sound Wall Construction
  • Road Closure
    6/20/18 to 6/21/18

    Wednesday (6/20) from 9 am to 3 pm and from 8 pm to 6 am, the US 183 southbound to northbound U-turn at Levander Loop will be closed. Follow the signed detour along Levander Loop.

    Bridge Construction

Long Term

  • Road Closure
    4/16/18 to 4/1/19

    Continuously from Monday (4/16/2018) at 9 am to Monday (4/1/2019) at 5 pm, Smith Road, west of US 183, and Thurgood Avenue will be closed at the US 183 southbound mainlanes. Follow signed detours.

    Roadway Base Installation
  • Road Closure
    5/11/18 to 12/30/19

    Starting April 25, 2017, and lasting till late December 2018, Central Avenue and Bluestein Drive are temporarily closed at their intersections with northbound US 183 for utility work. Traffic is being detoured via Techni Center Drive and Semi-Conductor Drive.

    Utility Work
  • Road Closure
    5/11/18 to 12/30/19

    Continuously between Friday June 5, 2017 at 8 pm to late December 2018, Levander Loop will be closed at the US 183 northbound turnaround. Follow the signed detour.

    Bridge Construction
  • Road Closure
    5/11/18 to 12/30/19

    Continuously from Saturday, January 13, 2017, at 7 am, to late December 2018, at 6 am, Tracor Lane and Marcel Gress will be closed at US 183.

    Utility Work
  • Lane Closure
    5/11/18 to 12/30/20

    Continuously from Friday (8/17/2017) at 8 pm to late December 2018, 51st Street on the west side of US 183 will be reduced to one lane in both directions between US 183 and Hutchinson Drive.

    Roadway Base Installation
  • Road Closure
    6/15/18 to 4/1/19

    Continuously between Thursday, June 14, 2018 at 8 pm until Monday, April 1, 2019 at 5 pm, Vargas Road will be closed at US 183. Follow signed detour.

    Roadway Base Installation
  • Road Closure
    6/15/18 to 4/1/19

    Continuously between Thursday, June 1, 2018 at 6 am until Monday, April 1, 2019 at 6 am, Eastgate will be closed at the US 183 southbound mainlanes. Follow signed detour.

    Roadway Base Installation
See all construction alerts >

Project Photos

Project Web Cameras

View ongoing construction >